Allbet Gaming

KPower gets four-year PPA extension for 50MW solar project

Allbet登录网址 2022年09月16日 社会 6 1

足球投注平台www.hg9988.vip)是皇冠体育官方投注平台,开放皇冠信用网代理申请、信用网会员开户,线上投注的官方平台。

KUALA LUMPUR: KPower Bhd’s subsidiary PKNP KPower Suria Sdn Bhd (PKSSB) has obtained an extension from the Energy Commission (EC) for the development of 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide their letter extended the final closing date from June 30 to Sept 30, 2022.

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023, from Sept 30, 2023 while the tenure of the power purchase agreement (PPA) was from 21 years to 25 years.

,

幸运哈希源码www.hx198.vip)采用波场区块链高度哈希值作为统计数据,游戏数据开源、公平、无任何作弊可能性,开放单双哈希、幸运哈希、哈希定位胆、哈希牛牛等游戏。

,

“PKSSB will execute a supplemental agreement with Tenaga Nasional Bhd to effect the aforesaid terms, where relevant, in the PPA.

“The board is of the opinion that the extension of time is in the best interest of the company,” it said.


转载说明:本文转载自Sunbet。 Allbet Gaming声明:该文看法仅代表作者自己,与www.allbetgame.us无关。转载请注明:KPower gets four-year PPA extension for 50MW solar project
发布评论

分享到:

网址(www.hg9988.vip):Currency swap initiative a win
1 条回复
  1. 免费足球推荐(www.hgbbs.vip)
    免费足球推荐(www.hgbbs.vip)
    (2022-09-16 00:14:23) 1#

    In a tweet, she said Kalwant’s family have been handed his belongings and death certificates by the Singapore authorities.累了的时候看这个

发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。